Aviation asset hierarchy template

A worked example of an aviation asset hierarchy: 25 classes in 4 levels, 23 data points and 15 decisions, each linked to the lifecycle stage it supports. It's a starting point built on general industry practice, not on any organization's real data.

Opens as your own editable copy. Nothing to sign up for.

classes
25
levels
4
data points
23
decisions
15
lifecycle stages
6

The levels

4 levels, from the whole network down to the part you maintain. Rename them to suit.

LevelWhat it holds
1. AirportThe whole airport. Holds the data points every asset shares.
2. Asset groupA family of assets that are managed, budgeted and reported together.
3. Asset classAssets alike enough to share a design life, an inspection regime and a cost model.
4. ComponentA part that is inspected, maintained or replaced on its own schedule.

The full class outline

Every class, with the data points it defines in italics. A class passes its data points to everything beneath it.

  • AirportAirside, landside and terminal assets an airport operator owns.the shared data points below
    • Airfield pavementRunways, taxiways and aprons.Pavement condition index, Pavement classification, Foreign object debris reports
      • RunwayTakeoff and landing surface.Friction level
      • TaxiwayConnects runways and aprons.
      • ApronAircraft parking.
    • Airfield lighting and navigationLights, signs and navaids.
      • Runway lightingEdge, centerline and approach lights.Lamp outage count
        • Light fixtureIndividual lamp unit.
        • Constant current regulatorPowers lighting circuits.
      • Airfield signGuidance signs.
      • Navigational aidOwner-maintained navaids.
    • TerminalPassenger buildings.Peak-hour passengers
      • Baggage handling systemConveyors and screening.Jam rate
        • ConveyorBelt sections.
        • Sortation unitRoutes bags.
      • Passenger boarding bridgeJet bridges.Availability
      • Vertical transportationElevators, escalators and walkways.
      • HVACTerminal heating and cooling.
    • LandsideRoads, parking and ground transport.
      • Parking structureGarages.Structural condition rating
      • Access roadAirport roads and curbs.
    • Airfield supportFuel, fleet and safety.
      • Fuel farmAviation fuel storage.
      • Rescue and firefighting vehicleARFF fleet.Response readiness
      • Perimeter fenceSecurity and wildlife fence.Breach count

The shared data points

12 data points defined once, on Airport, and inherited by every class. Each one carries a reason: the decisions it feeds.

Data pointTypeFeeds decisions
Install dateStarts the asset's life clock. Age, remaining life and renewal timing are all calculated from it.dateAs-built acceptance, Long-term financial forecast
AgeGroups assets by vintage for inspection planning and replacement forecasting.number · yearsInspection frequency, Long-term financial forecast, Retire or abandon
Expected useful lifeThe design or industry life for this class. Sets when renewal should be planned.number · yearsLong-term financial forecast, Capital renewal program
Remaining useful lifeHow long the asset can keep serving. The basis for the renewal year and the repair-or-replace call.number · yearsCapital renewal program, Repair, rehabilitate or replace
Condition scoreMeasured physical state, 1 (very good) to 5 (very poor). Drives inspection, maintenance and renewal decisions.number · 1–5Inspection frequency, Maintenance strategy, Repair, rehabilitate or replace, Retire or abandon
Likelihood of failureHow likely the asset is to fail, from condition, age and failure history. Half of the risk score.number · 1–5Risk ranking
Consequence of failureHow much a failure would cost in safety, service, environment and money. The other half of the risk score.number · 1–5Risk ranking, Inspection frequency, Maintenance strategy
Risk scoreLikelihood times consequence. Ranks assets so money goes to the highest risk first.number · LoF × CoFRisk ranking, Capital renewal program, Repair, rehabilitate or replace, Retire or abandon
Replacement costWhat it would cost to replace today. Feeds the capital plan and the long-term forecast.number · $Capital renewal program, Long-term financial forecast, Repair, rehabilitate or replace
Planned rehab / replace yearThe year renewal is planned. Turns risk and remaining life into a schedule and a budget.number · yearCapital renewal program, Long-term financial forecast
PM / CM ratioShare of maintenance hours that were planned rather than reactive. Shows whether the maintenance strategy is working.number · %Maintenance strategy
Operational areaMovement area, non-movement area or landside: sets inspection rules.enumDaily airfield inspection, Risk ranking

The decisions, and the lifecycle stages they sit in

9 decisions are shared by every template and 6 are specific to this one. The lifecycle runs Plan, Create, Operate, Maintain, Renew and Dispose.

DecisionStagesKind
Risk rankingPlan › Needs assessmentShared
Capital renewal programPlan › Capital planning, Renew › ReplaceShared
Long-term financial forecastPlan › Capital planningShared
Design standardsCreate › DesignShared
As-built acceptanceCreate › ConstructShared
Inspection frequencyOperate › InspectShared
Maintenance strategyMaintain › PreventiveShared
Repair, rehabilitate or replaceMaintain › Corrective, Renew › Rehabilitate, Renew › ReplaceShared
Retire or abandonDispose › DecommissionShared
Airfield pavement treatmentMaintain › Preventive, Renew › RehabilitateIndustry
Daily airfield inspectionOperate › InspectIndustry
Lighting outage responseMaintain › CorrectiveIndustry
Baggage system maintenance windowMaintain › PreventiveIndustry
Terminal capacity planningPlan › Needs assessment, Plan › Capital planningIndustry
Wildlife hazard responseOperate › MonitorIndustry

The Flow map

The same template as a Flow map: lifecycle stages, the decisions made in them and the data points each one needs.

The Aviation template in Strata's Flow map: lifecycle stages, the decisions made in them and the data points each decision needs, linked.

How to make it yours

  1. 01

    Rename the levels

    Open Setup › Levels and call each level what your organization calls it.

  2. 02

    Add your classes

    Add the classes you have that the template does not, or import your own list from Excel. Anything you add inherits the shared data points from its parent.

  3. 03

    Link your own decisions

    Open Setup › Decisions to change which decisions each data point feeds and which lifecycle stages they sit in. Gaps are counted for you.

Open the aviation template and make it yours.

Opens as your own editable copy. Nothing to sign up for.