Transportation asset hierarchy template
A worked example of a transportation asset hierarchy: 22 classes in 4 levels, 24 data points and 14 decisions, each linked to the lifecycle stage it supports. It's a starting point built on general industry practice, not on any organization's real data.
Opens as your own editable copy. Nothing to sign up for.
- classes
- 22
- levels
- 4
- data points
- 24
- decisions
- 14
- lifecycle stages
- 6
The levels
4 levels, from the whole network down to the part you maintain. Rename them to suit.
| Level | What it holds |
|---|---|
| 1. Network | The whole road network. Holds the data points every asset shares. |
| 2. Asset group | A family of assets that are managed, budgeted and reported together. |
| 3. Asset class | Assets alike enough to share a design life, an inspection regime and a cost model. |
| 4. Component | A part that is inspected, maintained or replaced on its own schedule. |
The full class outline
Every class, with the data points it defines in italics. A class passes its data points to everything beneath it.
- Road networkRoads and the assets along them that an agency owns.the shared data points below
- PavementRoad surface by segment.Pavement condition index, Surface type, Lane miles
- Roadway segmentA length of road between two points.
- ShoulderPaved or unpaved edge.
- Traffic controlDevices that guide and control traffic.
- Traffic signalSignalized intersection.Controller type
- Signal headLights facing traffic.
- DetectorLoop, video or radar detection.
- Controller cabinetHouses the controller.
- SignRegulatory, warning and guide signs.Retroreflectivity
- Pavement markingLines and symbols.Retroreflectivity
- Traffic signalSignalized intersection.Controller type
- RoadsideAssets beside the road.
- GuardrailBarriers that redirect vehicles.End treatment type
- Street lightRoadway lighting.Lamp type
- Sidewalk and rampPedestrian facilities.Accessibility compliant
- DrainageAssets that carry water off the road.
- CulvertPipe under the road.Culvert condition rating
- Storm drain inletCatch basins.
- DitchOpen channels.
- Fleet and facilitiesEquipment and yards that serve the network.
- Snow plowWinter maintenance vehicle.Route assignment
- Salt storageDomes and sheds.
- PavementRoad surface by segment.Pavement condition index, Surface type, Lane miles
The shared data points
13 data points defined once, on Road network, and inherited by every class. Each one carries a reason: the decisions it feeds.
| Data point | Type | Feeds decisions |
|---|---|---|
| Install dateStarts the asset's life clock. Age, remaining life and renewal timing are all calculated from it. | date | As-built acceptance, Long-term financial forecast |
| AgeGroups assets by vintage for inspection planning and replacement forecasting. | number · years | Inspection frequency, Long-term financial forecast, Retire or abandon |
| Expected useful lifeThe design or industry life for this class. Sets when renewal should be planned. | number · years | Long-term financial forecast, Capital renewal program |
| Remaining useful lifeHow long the asset can keep serving. The basis for the renewal year and the repair-or-replace call. | number · years | Capital renewal program, Repair, rehabilitate or replace |
| Condition scoreMeasured physical state, 1 (very good) to 5 (very poor). Drives inspection, maintenance and renewal decisions. | number · 1–5 | Inspection frequency, Maintenance strategy, Repair, rehabilitate or replace, Retire or abandon |
| Likelihood of failureHow likely the asset is to fail, from condition, age and failure history. Half of the risk score. | number · 1–5 | Risk ranking |
| Consequence of failureHow much a failure would cost in safety, service, environment and money. The other half of the risk score. | number · 1–5 | Risk ranking, Inspection frequency, Maintenance strategy |
| Risk scoreLikelihood times consequence. Ranks assets so money goes to the highest risk first. | number · LoF × CoF | Risk ranking, Capital renewal program, Repair, rehabilitate or replace, Retire or abandon |
| Replacement costWhat it would cost to replace today. Feeds the capital plan and the long-term forecast. | number · $ | Capital renewal program, Long-term financial forecast, Repair, rehabilitate or replace |
| Planned rehab / replace yearThe year renewal is planned. Turns risk and remaining life into a schedule and a budget. | number · year | Capital renewal program, Long-term financial forecast |
| PM / CM ratioShare of maintenance hours that were planned rather than reactive. Shows whether the maintenance strategy is working. | number · % | Maintenance strategy |
| Functional classArterial, collector or local; sets service levels and funding eligibility. | enum | Pavement treatment selection, Risk ranking |
| Average daily trafficWeights consequence of failure and treatment priority. | number · vehicles/day | Risk ranking, Safety improvement priority |
The decisions, and the lifecycle stages they sit in
9 decisions are shared by every template and 5 are specific to this one. The lifecycle runs Plan, Create, Operate, Maintain, Renew and Dispose.
| Decision | Stages | Kind |
|---|---|---|
| Risk ranking | Plan › Needs assessment | Shared |
| Capital renewal program | Plan › Capital planning, Renew › Replace | Shared |
| Long-term financial forecast | Plan › Capital planning | Shared |
| Design standards | Create › Design | Shared |
| As-built acceptance | Create › Construct | Shared |
| Inspection frequency | Operate › Inspect | Shared |
| Maintenance strategy | Maintain › Preventive | Shared |
| Repair, rehabilitate or replace | Maintain › Corrective, Renew › Rehabilitate, Renew › Replace | Shared |
| Retire or abandon | Dispose › Decommission | Shared |
| Pavement treatment selection | Maintain › Preventive, Renew › Rehabilitate | Industry |
| Sign and marking replacement | Renew › Replace | Industry |
| Signal timing review | Operate › Monitor | Industry |
| Winter operations routing | Operate › Monitor | Industry |
| Safety improvement priority | Plan › Needs assessment | Industry |
The Flow map
The same template as a Flow map: lifecycle stages, the decisions made in them and the data points each one needs.

How to make it yours
- 01
Rename the levels
Open Setup › Levels and call each level what your organization calls it.
- 02
Add your classes
Add the classes you have that the template does not, or import your own list from Excel. Anything you add inherits the shared data points from its parent.
- 03
Link your own decisions
Open Setup › Decisions to change which decisions each data point feeds and which lifecycle stages they sit in. Gaps are counted for you.
Open the transportation template and make it yours.
Opens as your own editable copy. Nothing to sign up for.